Frequently Asked Questions

FAQ's

  • What is a lien waiver, and why should I ask for one?

    It is a signed release confirming a subcontractor or supplier has been paid for work already furnished. Collecting them with each draw protects your title, since North Carolina claimants have 120 days from last furnishing to file a claim.

  • Do I need a permit to remodel my house?

    Usually yes. North Carolina exempts work under $40,000 on a single-family home, but that exemption drops away the moment you touch load-bearing structure, plumbing layout, HVAC, electrical wiring, or add roofing rather than replacing it. Most remodels cross one of those lines.

  • Who pulls the building permit, me or my contractor?

    Your contractor should. Whoever signs the application accepts responsibility for code compliance and for calling inspections, so a homeowner-pulled permit on hired work shifts that liability onto you. Building Carolinas Construction and Remodeling files permits for Asheville, NC projects ourselves.

  • What work can be done without a permit?

    Painting, flooring, cabinet swaps, trim, countertops, and like-for-like fixture replacements generally proceed without one. Anything structural, any new circuit, any relocated drain, and any new roof covering added over existing sheathing needs a permit regardless of project size.

  • What inspections happen during a home renovation?

    Sequence runs footing, then framing once the shell is dry and structure is exposed, then rough-ins for plumbing, mechanical, and electrical, then insulation, then a final. Each one has to pass before the next trade covers anything up.

  • What is a change order, and how do change orders work?

    Any deviation from the signed scope gets written up as a change order describing the work, the price adjustment, and the schedule impact, then signed by both parties before it proceeds. Verbal approvals are how most disputes start.

  • What is a punch list?

    Near the end of a project, you walk the space and note every remaining item: a paint touch-up, a door that binds, a missing switch plate, caulk that skipped. Those items get closed out before final payment is released.

  • How long does the design and planning phase take before construction starts?

    Plan on weeks, not days. Measuring, drawings, selections, and pricing take time, and permit review adds more. Locking materials and layout before demolition is what keeps the build from stalling halfway through waiting on a decision that could have been made earlier.

  • What happens if hidden damage is found after demolition?

    Older houses hide rot, failed wiring, and repairs done without permits. Work stops while we document the condition, price the correction as a change order, and wait for your approval. Building Carolinas Construction and Remodeling has met these surprises across Asheville, NC.

  • Should I move out during a remodel?

    Depends on what is offline. A single bathroom or one bedroom is livable. Losing the kitchen, the only full bath, or heat in winter usually is not, and dust control gets harder when the house stays fully occupied.

  • How do contractors keep dust out of the rest of the house?

    Zip-wall barriers seal the work area, floor protection runs the full path to the door, HVAC returns in the affected rooms get covered, and negative air machines pull dust outside instead of letting it drift down the hallway.

  • How do I prepare my house before a remodel starts?

    Empty the rooms in scope down to bare walls, relocate anything fragile well beyond the work zone, clear a parking spot and a dumpster location, secure pets away from open doors, and decide where we can access water and power on the property.

  • Do you have to bring an old house up to code when you remodel it?

    Only the work you touch, along with a few whole-house triggers. Any permitted alteration requires smoke and carbon monoxide alarms placed as new construction demands throughout the dwelling, even in rooms nowhere near the renovation. Untouched framing outside the scope generally stays.

  • Should I remodel my existing home, add on, or tear down and rebuild?

    Compare what the existing shell is worth keeping. Sound framing, a dry foundation, and a workable layout argue for remodeling. Failing structure, low ceilings, and a floor plan that fights every change often make new construction the better path.